Projects and News
Work has commenced...on the erection of 3 detached 4 bedroom houses and one detached double garage.
Initial Notice submitted...on three new build, timber framed, detached dwelling houses.
CBC appointed building control...on the erection of 8no. new build terraced houses.
CBC appointed...building control on the erection of 2no. new build dwellings in Uckfield.
Initial Notice submitted...on a two-storey side and first floor rear extension, including the removal of existing garage block; alterations to first floor layout, including dormer to existing bedroom.
Work due to commence soon...on a single storey rear extension, double storey side extension and hip to gable loft conversion with rear dormer and Juliette balcony.
CBC appointed...building control on 4no. new build apartments in a 3 storey block.
Initial Notice accepted...on the erection of a two storey side extension, loft conversion with rear dormer and associated internal alterations.
Initial Notice Accepted...on a two storey rear extension and conversion of property into 5 residential units.
Compliance Building Control (CBC) is delighted to confirm we have been approved and registered as a Registered Building Control Approver (RBCA).
Initial Notice accepted...on the conversion of an agricultural barn to 5no. dwellings.
CBC appointed...building control on erection of a detached dwelling.
Initial Notice submitted...on erection of three bedroom detached dwelling and detached garage.
CBC appointed...to carry out the building control services on a new build 5 bed detached dwelling in Essex.
Initial Notice accepted...on a new build detached warehouse building and new build detached dwelling house with associated garage.
Work due to commence soon...on the construction of a two storey side extension, and conversion of existing house to create attached new dwelling.