Projects and News
Initial Notice accepted...on the erection of single storey extension to create additional consulting rooms, utility rooms and disabled WC.
Initial Notice accepted...on ground floor rear extension and internal alterations to include, creation of music room, utility room, boot room and WC. Construction of detached double garage which includes habitable space.
Initial Notice accepted...on roof extension to the existing three storey building to provide 5 dwelling flats, with all associated works.
CBC appointed building control...on a loft conversion with rear dormer, single storey rear extension, thermal upgrades of existing external walls and new window to side elevation with internal alterations.
CBC appointed building control...on the erection of 2no. new build bungalows.
CBC appointed building control...on detached two storey new build dwelling with basement.
Initial Notice accepted...on 9no. new build dwellings; 1 detached two storey, 4 pairs of 3 storey semi-detached.
CBC appointed building control...on the conversion of two a storey building to form 6no.residential flats with some communal areas.
CBC appointed building control...on the erection of 2no. commercial units.
Initial Notice accepted...on the construction of a two storey side extension and single storey rear extension with internal alterations.
Initial Notice submitted...on the construction of 3 terraced 3 storey mews houses with basement.
Initial Notice accepted...on the extensions and alterations to form 13 flats by conversion and 21 new build flats.
CBC appointed building control...on the demolition of existing building and erection of 2no. three storey semi-detached houses.
CBC appointed Building Control....on a two storey side extension, extension of existing habitable loft, single storey rear extension, internal and external alterations.
Initial Notice accepted...on a new build detached dwelling.
Initial Notice accepted...on the conversion of barn to two storey dwelling & treatment plant.